Approval Gate
A required sign-off checkpoint before an experiment, rollout, or transition proceeds. Approval gates keep work bounded and ensure stakeholders control risk, scope, and budget.
Definitions of GHSTWRK terms used across the site.
A required sign-off checkpoint before an experiment, rollout, or transition proceeds. Approval gates keep work bounded and ensure stakeholders control risk, scope, and budget.
A measured description of the current workflow before changes are introduced. A baseline makes it possible to distinguish signal from anecdotes.
A method principle: measure the present before changing it. Baseline-first work prevents premature scale decisions and reduces the risk of shipping improvements that cannot be verified.
The process your organization uses to review, approve, and track operational or technical changes. GHSTWRK assumes change control is real and designs experiments to work inside it.
Operating inside formal constraints such as governance, security, approvals, and procurement without breaking trust or process.
A written recommendation at the end of a bounded phase: scale, stop, or iterate. It ties evidence to the next decision.
The transition from a pilot to internal ownership so the team can operate, support, and iterate without ongoing dependency.
The practical transfer package: runbooks, templates, routines, documentation, and governance notes intended for real operator use.
The combination of routines, documentation, roles, and checkpoints that keep a validated intervention running over time.
The client-side owner who carries the program after handoff and is enabled with training, documentation, and escalation paths.
A living record of what was tested, how outcomes were measured, what changed, and what did not. The ledger reduces ambiguity and supports defensible decisions.
Ongoing support that converts validated pilots into operating practice with clear ownership, reporting, and maintenance expectations.
Interventions designed to be rolled back if signal does not hold. Reversibility limits blast radius and keeps options open while learning.
A time-boxed pilot, typically 4-8 weeks, to answer one operational question and produce evidence plus a decision memo.
A 60-minute diagnostic to map context, constraints, and success signals. The output is a scoped pilot recommendation and a clear go/no-go decision.
A small, focused team that tests ideas quickly under constraints. In GHSTWRK's model, skunkworks work is paired with corporate-surface discipline so results can survive governance and scale.
Designing adoption from the workflow instead of the vendor. Instrumentation includes mapping workflows, defining boundaries, and creating templates and runbooks operators can use.